Recently on the agenda
-
Discussion: FY 2026–2027 streets and alleys maintenance strategies
Staff will present and the council will discuss the city's planned strategies for maintaining streets and alleys in fiscal year 2026–2027. No vote is expected.
The strategies discussed will shape which streets and alleys get repaired and how tax dollars are prioritized for road upkeep.
-
Review FY 2026-2027 Transportation and Mobility Work Plan
The council will review and discuss the city's Transportation and Mobility Work Plan for fiscal year 2026-2027, which outlines upcoming transportation projects and priorities.
The work plan shapes which road, traffic, and mobility projects the city will pursue in the coming year.
-
Approve TxDOT funding agreement for Collins Bridge signal and bike/pedestrian improvements
The council would approve an advance funding agreement with the Texas Department of Transportation to support signal upgrades and bike and pedestrian enhancements at Collins Bridge.
This agreement secures state transportation funding for safety and mobility improvements at Collins Bridge that benefit cyclists and pedestrians.
-
Award Bid #27-26 for Campbell Road and University Drive intersection improvements
Staff recommends awarding Bid #27-26 to JR West Texas Concrete, LLC to make intersection improvements at Campbell Road and University Drive for $1,182,134.
This construction project will improve a busy intersection used by many Richardson drivers and pedestrians.
-
Approve TxDOT funding agreement for Synergy Park Boulevard pedestrian and bike improvements
The city would enter an Advance Funding Agreement with TxDOT under the Surface Transportation Block Grant (STBG) program using Transportation Development Credits (TDC) to fund pedestrian improvements including bicycle lanes, sidewalks, crosswalks, lighting, bus stops, and a roundabout on Synergy Park Boulevard from Waterview Parkway to Floyd Road.
This project would significantly upgrade walking, biking, and transit access along a key Richardson corridor.
-
Discussion of streets and alleys maintenance strategies
The council will review and discuss the city's current strategies for maintaining Richardson's streets and alleys.
The approach the city takes to street and alley maintenance directly affects road conditions and quality of life for residents throughout Richardson.
All matters with this topic
-
Discussion: FY 2026–2027 streets and alleys maintenance strategies
Staff will present and the council will discuss the city's planned strategies for maintaining streets and alleys in fiscal year 2026–2027. No vote is expected.
-
Approve TxDOT funding agreement for Collins Bridge signal and bike/pedestrian improvements
The council would approve an advance funding agreement with the Texas Department of Transportation to support signal upgrades and bike and pedestrian enhancements at Collins Bridge.
-
Review FY 2026-2027 Transportation and Mobility Work Plan
The council will review and discuss the city's Transportation and Mobility Work Plan for fiscal year 2026-2027, which outlines upcoming transportation projects and priorities.
-
Award Bid #27-26 for Campbell Road and University Drive intersection improvements
Staff recommends awarding Bid #27-26 to JR West Texas Concrete, LLC to make intersection improvements at Campbell Road and University Drive for $1,182,134.
-
Approve TxDOT funding agreement for Synergy Park Boulevard pedestrian and bike improvements
The city would enter an Advance Funding Agreement with TxDOT under the Surface Transportation Block Grant (STBG) program using Transportation Development Credits (TDC) to fund pedestrian improvements including bicycle lanes, sidewalks, crosswalks, lighting, bus stops, and a roundabout on Synergy Park Boulevard from Waterview Parkway to Floyd Road.
-
Discussion of streets and alleys maintenance strategies
The council will review and discuss the city's current strategies for maintaining Richardson's streets and alleys.
-
Contract award for alley rehabilitation — Bid #08-26
Staff requests authorization to award an annual requirements contract to R&A Legacy Construction, LLC for alley rehabilitation work in the estimated amount of $1,170,871.27.
-
Contract award for neighborhood street rehabilitation — Bid #09-26
Staff requests authorization to award an annual requirements contract to R&A Legacy Construction, LLC for neighborhood street rehabilitation in the estimated amount of $2,157,170.
-
Discussion: Safer Streets Richardson program
Council will review and discuss the Safer Streets Richardson initiative, which addresses street and traffic safety in the city.
-
Discussion of streets, alleys, and sidewalk needs for a potential 2026 bond program
Council will review and discuss what street, alley, and sidewalk projects might be included if the city pursues a bond program in 2026. No vote is taken at this stage — it is a planning conversation.
-
Change order of $67,192.56 to DDM Construction for Floyd Rd. and Royal Crest Dr. street work
Council will authorize a $67,192.56 increase to an existing contract with DDM Construction Corporation for street improvements on Floyd Road to Lindale Lane and Royal Crest Drive to a cul-de-sac (Contract #325000350).
-
Discussion of transportation and mobility needs for a possible 2026 bond program
The Council will review and discuss the city's transportation and mobility needs that could be included in a potential 2026 bond program.
-
Award $2.5 million concrete contract for Richland Park street segments
Council is asked to award Bid #67-25 to Estrada Concrete Company for concrete work on two Richland Park street segments — Sheffield to Tiffany and Stillmeadow to Wentworth — for $2,546,841.
-
Award $9.5 million contract for West Shore Drive and Fontana Avenue reconstruction
Council is asked to award Bid #83-25 to Estrada Concrete Company LLC for street and utility reconstruction on West Shore Drive and Fontana Avenue in the amount of $9,473,392.
-
Agreement with TxDOT for improvements at US 75 and Arapaho Road
The council will consider a resolution approving an agreement with the Texas Department of Transportation for a local on-system improvement project at the US 75 and Arapaho Road intersection, and authorizing the City Manager to sign it.
-
Increase contract with Reliable Paving by $900,000 for 2024 asphalt overlay project
The council will increase contract #325000053 with Reliable Paving, Inc. by $900,000 for the 2024 Asphalt Overlay Project, which resurfaces city streets.
-
Award $2,027,429 contract for arterial and collector street rehabilitation (Bid #70-25)
The city recommends awarding Bid #70-25 to Estrada Concrete Company in the amount of $2,027,429 to rehabilitate arterial and collector streets.
-
Review FY 2025-2026 streets and alleys maintenance strategies
Staff will present the planned strategies for maintaining Richardson's streets and alleys during fiscal year 2025-2026 for council review and discussion.
-
Review FY 2025-2026 transportation and mobility work plan
Staff will present the city's planned transportation and mobility projects and initiatives for fiscal year 2025-2026 for council review and discussion.
-
Authorize annual cooperative contract for cold and hot mix asphalt materials
Council will authorize Bid #82-25 to issue a cooperative annual requirements contract to Austin Asphalt Inc. (primary) and Texas Materials Group (secondary) for cold and hot mix asphalt at unit prices from City of Garland Bid #0784-25.
-
Contract for traffic monitoring camera systems — $120,000/year (Bid #73-25)
Council considers authorizing a cooperative annual requirements contract with Allied Universal Technology Services for traffic monitoring camera systems through OMNIA Partners Contract #R240809, with an estimated annual expenditure of $120,000.
-
Contract for streetlight equipment and installation — $177,000/year (Bid #78-25)
Council considers authorizing a cooperative annual requirements contract with Voss Electric Co. for streetlight system equipment and installation services through HGAC Contract #HT06-20, with an estimated annual expenditure of $177,000.
-
Resolution supporting TxDOT grant application for US 75 at Belt Line Road crossing improvements
Council considers approving a resolution in support of the city's application to the Texas Department of Transportation's 2025 Transportation Alternatives Set-Aside program to fund crossing enhancements at US 75 and Belt Line Road.
-
Updates on Capital Improvement Plan projects
Staff will review and discuss the status of current Capital Improvement Plan projects across the city.
-
Contract with Aushill Construction for E. Nantucket Drive improvements — $1,738,770
The city would award a contract to Aushill Construction, LLC to improve E. Nantucket Drive from Melrose Drive to south of Vernet Drive, at a cost of $1,738,770.
-
Contract with McMahon Contracting for Jonsson Boulevard and Tatum Street — $3,041,473.58
The city would award a contract to McMahon Contracting for street improvements at Jonsson Boulevard and Tatum Street, at a cost of $3,041,473.58.
-
Award $5.64 million street construction contract — Sherman/Kaufman/Lingco/Spring Valley
The council will award a contract to DDM Construction Company for street improvements connecting Sherman Street, Kaufman Drive, Lingco Drive, and Spring Valley Road in the amount of $5,640,373.
-
Award $1.17 million contract for Spring Valley Road and Abrams Road intersection improvements
The council will award a contract to Texas Standard Construction for improvements to the intersection of Spring Valley Road and Abrams Road in the amount of $1,173,877.95.
-
Contract for concrete street leveling services through TIPS cooperative (Bid #47-25)
The Council was asked to authorize a cooperative annual requirements contract with Kaitlin Kent Enterprises, Inc. dba KKE Concrete Lifting for street leveling services through the Interlocal Purchasing System (TIPS) Contract #23010401.
-
Change order increasing Main Street reconstruction contract by $274,915.22
The Council was asked to approve a change order increasing Contract #321000520 with Rebcon, Inc. for the Main Street Reconstruction Project by $274,915.22.
-
Presentation on US 75 HOV/Technology Lanes and the US 75–PGBT interchange
TxDOT or city staff will present information on planned High Occupancy Vehicle and technology lanes along US 75 and improvements to the interchange with the President George Bush Turnpike.
-
Presentation on US 75 crossing projects in Richardson
Staff will present information on projects related to crossings of US 75 within Richardson.
-
Award $9.1 million contract for Lakeside Blvd. and Lawnview Dr. road improvements
Staff recommends awarding Bid #17-25 to McMahon Contracting LP for street improvements on Lakeside Boulevard (from US-75 to East Campbell Road) and Lawnview Drive (from Lakeside Boulevard to North Greenville Avenue), at a cost of $9,121,798.98.
-
Annual street sweeping contract with Sweeping Corporation of America (Bid #16-25)
Council will consider authorizing an annual requirements contract with Sweeping Corporation of America, LLC to perform street sweeping services at unit prices.
-
Award $3,184,555 contract for Main Street Phase II reconstruction from Greenville Avenue to Abrams Road
Bid #06-25 would award a construction contract to Urban InfraConstruction, LLC for $3,184,555 to complete Phase II of the Main Street project, running from Greenville Avenue to Abrams Road.
-
Resolution 24-27: TxDOT agreement for traffic signal improvements
The council would approve an Advance Funding Agreement with the Texas Department of Transportation for a Highway Safety Improvement Project to fund traffic signal upgrades in Richardson, and authorize the City Manager to sign it.
-
Award $1,293,220 contract to Jeske Construction for 2021 bond alley reconstruction — Group 5
Staff recommends awarding Bid #88-24 to Jeske Construction Company for $1,293,220 to reconstruct alleys in five residential areas — Provincetown Lane, Wilderness Trail, Roundrock Circle, and Pinehurst Drive — using 2021 bond funds.
-
Purchase one aerial truck for Transportation and Mobility for $159,615 via Sourcewell
Council is asked to authorize a purchase order to Altec for one aerial truck for the Transportation and Mobility department in the total amount of $159,615, through Sourcewell Contract #040924-ALT.
-
Award $3,651,963.75 contract to Reliable Paving for 2024 asphalt overlay work
Council is asked to award Bid #53-24 to Reliable Paving, Inc. in the amount of $3,651,963.75 for the 2024 asphalt overlay project, which resurfaces city streets.
-
Purchase two Ford F250 trucks for street maintenance for $121,376 (Bid #107-24)
Council will authorize a purchase order to Rush Truck Center for two Ford F250 trucks for the Public Services Street Maintenance division through BuyBoard cooperative Contract #724-23 in the total amount of $121,376.
-
Award $21.8 million contract for Custer Parkway reconstruction from Campbell to SH 190 (Bid #91-24)
Council will award Bid #91-24 to DDM Construction Corporation for the reconstruction of Custer Parkway between Campbell Road and SH 190 in the amount of $21,812,798.
-
Award contract for traffic signal construction at Waterview Parkway and Frank Johnson Drive
The council will consider awarding Bid #47-24 to Road Solutions, LLC to construct a traffic signal at the intersection of Waterview Parkway and Frank Johnson Drive for $447,765.25.
-
Approve grant agreement with U.S. DOT for Safe Streets and Roads for All program
The council will consider Resolution No. 24-11 to authorize the city to enter into a grant agreement with the U.S. Department of Transportation Federal Highway Administration under the FY 2023 Safe Streets and Roads for All grant program.
-
Bid #87-24: $1,880,788 contract for E. Prairie Creek Drive improvements
Council will consider awarding a contract to Ratliff Hardscape, Ltd. in the amount of $1,880,788 (including Alternates 1 and 2) to make street improvements on E. Prairie Creek Drive from Fall Creek Drive to the end of the road.
-
Award $3,649,318.85 contract for Canyon Brook, Canyon Valley, and Forest Grove street and utility improvements
Staff recommends awarding Bid #48-24 to KIK Underground, LLC in the amount of $3,649,318.85 for pavement and utility improvements in the Canyon Brook, Canyon Valley, and Forest Grove neighborhoods.
-
Award $1,973,140 contract for 2021 Bond alley reconstruction — Group 8
Staff recommends awarding Bid #59-24 to Ratliff Hardscape, Ltd. in the amount of $1,973,140 to reconstruct alleys in the South Grove Road, Weatherred Drive, Park Place, Centennial Boulevard, and Carrington Drive areas using 2021 bond funding.
-
Award $2,502,360 contract to reconstruct Newberry Drive and Royal Crest Drive
Staff recommends awarding Bid #68-24 to DDM Construction Corporation in the amount of $2,502,360 to reconstruct Newberry Drive from Floyd Road to Lindale Lane and Royal Crest Drive from Grove Road to its cul-de-sac.
-
Discussion of FY 2024-2025 streets and alleys maintenance strategies
Council will review and discuss the city's planned approach for maintaining streets and alleys during the upcoming fiscal year.
-
Bid #72-24: Annual contract with A&M Maintenance Services for pavement markings
The council is asked to award an annual requirements contract to A&M Maintenance Services, Inc. for furnishing and installing pavement marking materials (such as lane lines and crosswalk paint) at unit prices.
-
Discussion: Transportation and Mobility Work Plan
The council will review and discuss the city's Transportation and Mobility Work Plan, which outlines upcoming projects and priorities for moving people around Richardson.
-
Discussion: Custer Parkway reconstruction from W. Campbell Road to SH 190
The council will review and discuss the planned reconstruction project on Custer Parkway between West Campbell Road and State Highway 190.
-
Resolution 24-09: Approve interlocal agreement with Dallas County for Maple Street reconstruction
This resolution approves a project-specific agreement with Dallas County under an existing Road & Bridge Master Interlocal Agreement for improvements to Maple Street from Greenville Avenue to Abrams Road, designated a "Type E" public roadway.
-
Award $2,812,226 contract for Greenville Avenue multimodal improvements
Staff recommends awarding Bid #07-24 to The Fain Group, Inc. in the amount of $2,812,226 for the Greenville Avenue Multimodal Improvements project (CSJ #0918-47-323).
-
Award $1,056,890 contract for 2021 Bond alley reconstruction (Group 6)
Staff recommends awarding Bid #49-24 to Candor Builders, Inc. in the amount of $1,056,890 to reconstruct a group of alleys funded by the 2021 bond program.
-
Adopt the City of Richardson Complete Streets Policy
Resolution No. 24-07 would formally adopt a Complete Streets Policy for Richardson, establishing a framework for designing streets that serve all users — drivers, pedestrians, cyclists, and transit riders.
-
Discussion: Bicycle Friendly Community Silver designation pathway and Complete Streets policy
Council reviews Richardson's pathway toward achieving a Silver-level Bicycle Friendly Community designation and discusses adopting a Complete Streets policy aimed at making roads safer for all users — cyclists, pedestrians, and drivers alike.
-
Award $1.75 million contract to repair alleys in five neighborhoods
Council will award Bid #04-24 to Muniz Construction, Inc. for the 2021 Bond Alley Group 2 Project, covering Chestnut Hill Ln., Aurora Dr., Elk Grove Dr., Georgetown Dr., and Windsong Trail, for $1,751,295.
-
Award $1.76 million contract for 2021 bond alley repairs on four streets
Council is asked to award Bid #33-24 to La Banda, LLC in the amount of $1,762,063 for the 2021 Bond Alley Group 7 Phase 2 project, covering alley improvements on Stardust Lane, Elizabeth Lane, Beltline Road, and Rotary Drive.
-
Authorize annual cooperative contract with Dustrol, Inc. for street milling services
The city requests authorization to issue an annual requirements contract to Dustrol, Inc. for street milling services at unit prices established under Tarrant County contract #F2024052.
-
Authorize annual cooperative contract with Texas Materials Group for asphalt overlay services
The city requests authorization to issue an annual requirements contract to Texas Materials Group, Inc. for asphalt overlay services at unit prices established under Dallas County Solicitation #2022-046-6961.
-
Bid #27-24: award $6.19 million contract to reconstruct West Shore and Newberry drives
Staff recommends awarding Bid #27-24 to Muniz Construction, Inc. for $6,193,044 to reconstruct West Shore Drive from Arapaho to Lakeview Drive and Newberry Drive from West Shore Drive to Brookhurst Drive, including Alternate #1.
-
Bid #39-24: annual contracts to two vendors for traffic count data services
The council is asked to authorize annual requirements contracts with Quality Traffic Data, LLC and National Data and Surveying Services for a traffic count program at unit prices established through Bid #39-24.
-
Award $686,924 contract for Wake Drive and Baylor Drive alley and sewer improvements (Bid #22-24)
The council is asked to award a contract to Candor Builder, LLC in the amount of $686,924 for paving and sanitary sewer improvements to alleys on Wake Drive and Baylor Drive as part of the 2021 Bond Alley Group 4 project.
-
Approve state funding agreement for traffic signal safety improvements
The council is asked to adopt Resolution No. 24-02, approving an Advance Funding Agreement between the City of Richardson and the Texas Department of Transportation for a Highway Safety Improvement Program project to improve traffic signals. The city manager would be authorized to sign the agreement.
-
Bid #26-24: annual contract with Durable Specialties for traffic signal construction
The city requests authorization to award an annual requirements contract to Durable Specialties, Inc. for traffic signal and miscellaneous traffic construction work at unit prices set in Bid #26-24.
-
Discussion of the city's pothole repair policy
The council will review and discuss the city's current policy for identifying and repairing potholes on Richardson streets.
-
Award $2,182,370 contract to reconstruct Sherwood Drive
The city recommends awarding Bid #05-24 to DDM Construction Corporation for $2,182,370 to reconstruct Sherwood Drive from Weatherred Drive to Lindale Lane.
-
Increase Axis Contracting street reconstruction contract by $431,466.25
The city will increase Contract #323000026 with Axis Contracting, Inc. by $431,466.25 for the West Prairie Creek Drive reconstruction project running from North Collins Blvd. to West Campbell Rd.
-
Decrease Aushill Construction street reconstruction contract by $57,927.70
The city will decrease Contract #323000291 with Aushill Construction, LLC by $57,927.70 for the Napier Drive Reconstruction Project.
-
Agreement with TxDOT for federal air-quality funding at Campbell Road and University Parkway
Resolution No. 23-31 would authorize the city manager to sign an Advance Funding Agreement with the Texas Department of Transportation under the Congestion Mitigation and Air Quality Improvement Program for the Campbell Road at University Parkway project.
-
Contract with Iteris, Inc. for traffic detection equipment — up to $700,000 first year
Bid #10-24 would authorize a cooperative annual contract with Iteris, Inc. for traffic detection system equipment and installation services through BuyBoard contract #695-23, estimated at $700,000 for the first year and $200,000 in subsequent years.
-
Contract with Allied Universal Technology Services for traffic cameras — up to $100,000/year
Bid #11-24 would authorize a cooperative annual contract with Allied Universal Technology Services for traffic monitoring camera systems through OMNIA Partners contract #R192008, estimated at $100,000 per year.
-
Award Bid #103-23: 2021 bond alley reconstruction (Custer Parkway) to KIK Underground
Council is asked to award Bid #103-23 to KIK Underground, LLC for the 2021 Bond Alley Group 7 – Phase 1 (Custer Parkway) project at a cost of $763,342.60.
-
Discuss public outreach strategy for Custer Parkway reconstruction
The council will review and discuss the plan for engaging residents and stakeholders during the upcoming Custer Parkway reconstruction project. No formal vote is taken at this stage.
-
Award 2021 Bond alley reconstruction Group 1 to Muniz Construction (Bid #75-23)
Staff recommends awarding Bid #75-23 to Muniz Construction, Inc. in the amount of $1,785,635 for 2021 Bond Alley Reconstruction Group 1.
-
Award 2021 Bond alley reconstruction Group 3 to Candor Builders (Bid #77-23)
Staff recommends awarding Bid #77-23 to Candor Builders, LLC in the amount of $418,959 for 2021 Bond Alley Reconstruction Group 3, covering Chapel Creek Court and Canyon Creek Drive.
-
Authorize agreement with TxDOT for traffic signal equipment reimbursement (Resolution No. 23-23)
Resolution No. 23-23 would authorize the City Manager to negotiate and execute an agreement with the Texas Department of Transportation for the city to be reimbursed for traffic signal equipment costs.
-
Decrease Canyon Creek alley reconstruction contract with Advance Contracting by $117,088.88
The council is asked to reduce the existing contract with Advance Contracting for the Canyon Creek Alley Reconstruction project (Alleys A-E) by $117,088.88.
-
Annual contract for traffic signal controller hardware, est. $60,000
The council will consider authorizing an annual requirements contract to Texas Highway Products, Ltd for traffic signal controller hardware through BuyBoard Contract #703-23, with an estimated annual expenditure of $60,000.
-
Annual contract for street banner installation and removal
The council will consider authorizing an annual requirements contract for the installation and removal of street banners, with an estimated annual expenditure of $65,000.
-
Discussion: FY 2023-2024 streets and alleys maintenance strategies
The council will review and discuss the city's planned maintenance strategies for streets and alleys in the upcoming fiscal year.
-
Council reviews transportation and mobility work plan
The council will review and discuss the city's Transportation and Mobility Work Plan, which outlines planned transportation and mobility initiatives.
-
Award $247,640 contract for 2023 asphalt overlay project
Staff recommends awarding Bid #67-23 to Peachtree Construction, Ltd. in the amount of $247,640 to resurface city streets as part of the 2023 asphalt overlay project.
-
Approve up to $60,000 annually for traffic control products via BuyBoard
Bid #92-23 would authorize an annual cooperative purchasing contract with Mobotrex, Inc. for traffic control products through BuyBoard contract #703-23, with an estimated annual spend of $60,000.
-
Increase Main Street Phase II construction contract by $305,147
Staff requests a $305,147.22 increase to Contract #321000520 with Rebcon, Inc. for the Main Street Phase II project.
-
Increase West Prairie Creek Drive construction contract by $134,307
Staff requests a $134,307.10 increase to Contract #323000026 with Axis Contracting, Inc. for the West Prairie Creek Drive project (Campbell Road to Collins Boulevard).
-
Annual contract for traffic sign materials — $60,000
Bid #79-23 requests authorization for a cooperative annual requirements contract with Centerline Supply, Inc. through BuyBoard Contract #703-23, for up to $60,000 in materials used to repair, maintain, and replace traffic signs across the city.
-
Discussion of the traffic signal box art contest
Council will review and discuss a contest to place artwork on traffic signal boxes in the city.
-
Award $2,617,940 contract for collector and arterial streets rehabilitation
Staff recommends awarding Bid #20-23 to FNH Construction, LLC in the amount of $2,617,940 to rehabilitate collector and arterial streets in Richardson.
-
TxDOT briefing on US 75 high-occupancy vehicle technology lanes project
The Texas Department of Transportation will brief the council on a planned High Occupancy Vehicle (HOV) technology lanes project along US Highway 75, which runs through Richardson.
-
Resolution 23-10: accept 2023 bullet-resistant shield program grant funds
The council would approve the terms of a 2023 Bullet-Resistant Shield Program grant and designate the Director of Emergency Management as the authorized official to manage the grant.
-
Award $490,423 contract for Napier Drive reconstruction
The city recommends awarding Bid #09-23 to Aushill Construction, LLC to reconstruct Napier Drive at a cost of $490,423.00.
-
Award annual contract to Nortex Concrete for pavement leveling services
The city requests authorization to issue an annual requirements contract to Nortex Concrete Lift & Stabilization, Inc. for pavement leveling services under Bid #31-23, based on unit prices.
-
Authorize interlocal agreement with Dallas County for road improvements and maintenance
Resolution No. 23-04 would allow the city manager to negotiate and sign a master interlocal agreement with Dallas County covering transportation improvements and maintenance on certain roadways within Richardson's city limits.
-
Award bid for Main Street tree replacement to Fannin Tree Farm
Staff recommends awarding Bid #19-23 to Fannin Tree Farm in the amount of $156,150 to replace trees along Main Street.
-
Discussion of transportation and mobility projects
Council will review and discuss the city's current and planned transportation and mobility projects.
-
Award bid for traffic signal video detection system installation — $286,360
Council is asked to authorize a purchase order to Iteris, Inc. for $286,360 to install traffic signal video detection systems through the Local Government Purchasing Cooperative (BuyBoard) Contract #608-20.
-
Purchase 40 traffic signal video detection systems for $876,470.50
The city wants to buy 34 traffic signal video detection systems from Iteris, Inc. for $744,470.50 and 6 additional systems from Texas Highway Products, Ltd. for $132,000, both through the BuyBoard cooperative purchasing contract #608-20.
-
Decrease contract with XIT Paving for Scottsdale Drive project by $77,383.24
The council is asked to approve a change order that reduces contract #321000283 with XIT Paving and Construction, Inc. for the 2020 Scottsdale Drive Street & Utility Reconstruction Project by $77,383.24.
-
Award $20.9 million contract to Tiseo Paving Company for North Glenville Drive project
Council considers awarding Competitive Sealed Proposal #904-22 to Tiseo Paving Company for the North Glenville Drive Project in the amount of $20,903,157.25.
-
Increase contract for Campbell Road improvements by $103,845.40
Council considers increasing Contract #321000496 with Quality Excavation, LLC for Campbell Road improvements from Collins to US 75 by $103,845.40.
-
Agreement with TxDOT for federal funding of traffic signal upgrade at Waterview Pkwy and Frank Johnson Dr
Resolution No. 22-31 authorizes an Advance Funding Agreement with the Texas Department of Transportation under the Surface Transportation Block Grant program to fund traffic signal improvements at the intersection of Waterview Parkway and Frank Johnson Drive.
-
Agreement with TxDOT for federal funding of traffic signal upgrade at E. Campbell Rd and N. Jupiter Rd
Resolution No. 22-32 authorizes an Advance Funding Agreement with the Texas Department of Transportation under the Surface Transportation Block Grant program to fund traffic signal improvements at the intersection of E. Campbell Road and N. Jupiter Road.
-
Award annual contract for street rehabilitation to Urban Infraconstruction (Bid #84-22)
The council is asked to authorize an annual requirements contract with Urban Infraconstruction, LLC for street rehabilitation work, priced according to unit prices established in Bid #84-22.
-
Award annual contract for 2022-2023 alley repairs to Cam-Crete Contracting (Bid #86-22)
The council is asked to authorize an annual requirements contract with Cam-Crete Contracting, Inc. for the 2022-2023 alley repairs program, priced by unit prices in Bid #86-22.
-
Award contract for alley reconstruction between N. Coit Rd. and La Mesa Dr. (Bid #92-22)
The council is asked to award Bid #92-22 to Aushill Construction, LLC for alley reconstruction between N. Coit Road and La Mesa Drive, from Apache to Chippewa, in the amount of $270,330.
-
Update on N. Glenville Drive street reconstruction project
Staff will provide a status update to the council on the ongoing street reconstruction project on N. Glenville Drive.
-
Purchase traffic signal cabinets and controllers through cooperative contracts
The city requests authorization to buy eight traffic signal cabinets with battery backup systems from Consolidated Traffic Controls, Inc. for $173,608 through HGAC Contract #PE05-21, and eight traffic controllers from Texas Highway Products, Ltd. for $22,880 through BuyBoard Contract #608-20. The total purchase is $196,488.
-
Bid #88-22: Annual contract for concrete repair with EM Construction
The council is asked to authorize an annual requirements contract with Medrano Enterprises dba EM Construction to perform concrete repair work at unit prices.
-
Bid #93-22: Purchase 35 mast arm poles for traffic signal rebuilds — $463,999
The council is asked to authorize a $463,999 purchase order to Consolidated Traffic Controls, Inc. for 35 mast arm poles used in traffic signal rebuilds, purchased cooperatively through HGAC Contract #PE05-21.
-
Award bid for Renner Road bridge repair over Prairie Creek
Staff recommends awarding Bid #74-22 to McMahon Contracting, L.P. in the amount of $617,652.78 to repair the Renner Road bridge over Prairie Creek.
-
Award Bid 69-22: annual contract for US 75 and underpass street lighting maintenance
Staff requests authorization to issue an annual requirements contract to Standard Utility Construction, Inc. for maintenance and repairs of street lighting along US 75 and underpasses at unit prices under Bid #69-22.
-
Award Bid 75-22: annual contract for aggregate flex base material
Staff requests authorization to issue an annual requirements contract to Big City Crushed Concrete for aggregate flex base material at unit prices under Bid #75-22.
-
Award Proposal 903-22: West Prairie Creek Drive reconstruction for $7,401,650
Staff recommends awarding Competitive Sealed Proposal #903-22 to Axis Contracting, Inc. for the reconstruction of West Prairie Creek Drive from Campbell Road to Collins Boulevard in the amount of $7,401,650, which includes two alternate bid items.
-
Resolution 22-11: Dallas County agreement for Glenville Drive transportation improvements
Resolution No. 22-11 would approve a project-specific agreement with Dallas County under the Major Capital Improvement Program (MCIP Project 22101) for transportation improvements on Glenville Drive from Arapaho Road to Campbell Road, and authorize the City Manager to sign it.
-
Council reviews the Transportation and Mobility work plan
The council will review and discuss the city's planned transportation and mobility projects and priorities.
-
Award tree-planting contract on McKinney Street for $119,713.93
Staff recommends awarding Bid #45-22 to Environmental Design, Inc. for the Main Street Contract Tree Grow Phase II (McKinney Street Completion) project at a cost of $119,713.93.
-
Award 2022 asphalt overlay contract to Peachtree Construction for $323,322.90
Staff recommends awarding Bid #49-22 to Peachtree Construction, Ltd for the 2022 Asphalt Overlay Program at a cost of $323,322.90.
-
Authorize annual cooperative contract for concrete paving services
The city requests authorization to issue an annual requirements contract to Santos Construction, Inc. and McMahon Contracting, LP for concrete paving services, using the unit prices from City of Grand Prairie Bid #21045 through a cooperative purchasing arrangement.
-
Increase change order for Main Street reconstruction by $509,152.04
Council considers authorizing a change order to increase Purchase Order #191674 to Rebcon, Inc. for Main Street reconstruction by $509,152.04.
-
Abandon a portion of Alma Road right-of-way (Ordinance No. 4428)
Council considers adopting Ordinance No. 4428 to officially abandon a described portion of Alma Road, while preserving any existing easement rights. A certified copy will be recorded in Dallas County public records as a quitclaim deed.
-
Approve interlocal agreement with Dallas County for road repairs (Resolution No. 22-04)
Council considers Resolution No. 22-04 to approve a project-specific Type B agreement with Dallas County under the Master Road & Bridge Interlocal Agreement for repair, maintenance, and improvements on a qualified public roadway within Richardson.
-
Road maintenance partnership with Dallas County reviewed
The council will review and discuss the city's road maintenance partnership with Dallas County.
-
McKinney Street reconstruction project reviewed
The council will review and discuss the reconstruction project planned for McKinney Street.
-
Award $1.5 million contract for St. Paul Court alley, retaining wall, and utility work
Under Bid #29-22, staff recommends awarding a $1,500,000 contract to Iron T Construction, Inc. to replace the alley, retaining wall, and utilities on St. Paul Court.
-
Reduce Peachtree Construction contract for 2021 asphalt overlay by $70,786.97
The council is asked to approve a change order that decreases Purchase Order #211270 to Peachtree Construction for the 2021 Asphalt Overlay Program by $70,786.97.
-
Annual contract with Urban InfraConstruction for street rehabilitation
The city would award an annual requirements contract to Urban InfraConstruction, LLC, to perform street rehabilitation work throughout the city at unit prices set through the competitive bid process.
-
Agreement with Dallas County for McKinney Street and Main Street turn-lane improvements
The city would enter a project-specific agreement with Dallas County under their Master Agreement for Major Capital Improvements to fund transportation upgrades: McKinney Street Phase 1A and a center turn lane on Main Street Phase 1B.
-
Award $437,575 contract to rehabilitate Jupiter Road bridge over Spring Creek
Under Bid #01-22, council is asked to award a contract to McMahon Contracting in the amount of $437,575.30, including Bid Alternate No. 1, to rehabilitate the Jupiter Road bridge over Spring Creek.
-
Issue cooperative contract for pavement crack and joint sealing services
Under Bid #27-22, council is asked to authorize an annual requirements contract with Curtco, Inc. for pavement crack and joint sealing services, using unit prices from City of Grand Prairie Contract #21186.
-
Issue cooperative contract for pavement leveling services
Under Bid #28-22, council is asked to authorize an annual requirements contract with Nortex Concrete Lift & Stabilization, Inc. for pavement leveling services, using unit prices from City of Grand Prairie Bid #21158.
-
Award $8.46 million contract for Custer Road paving, drainage, and utility improvements
The city recommends awarding Bid #02-22 to Axis Contracting in the amount of $8,462,577.88 (including bid alternates 1, 3, 4, 5, and 6) for paving, drainage, and utility improvements on Custer Road from Arapaho Road to Campbell Road.
-
Cooperative contract with Mobotrex for traffic control products
The city seeks authorization to issue a cooperative annual requirements contract under Bid #22-22 to Mobotrex for traffic control products through BuyBoard Contract #608-20, at percentage discounts.
-
Update on the W. Prairie Creek Dr. project
Staff will brief the council on the current status of the West Prairie Creek Drive project.
-
Annual contracts for traffic signs and materials — multiple vendors
Council is asked to authorize annual requirements contracts with Newman Signs, Vulcan Signs, and Centerline Supply for traffic signs and materials at unit prices established through City of McKinney Bid #21-21FP.
-
Agreement with TxDOT for traffic signal safety improvements funding
Resolution No. 21-23 would authorize the City Manager to sign an Advance Funding Agreement with the Texas Department of Transportation under the Highway Safety Improvement Program for an off-system traffic signals improvement project.
-
Agreement with Regional Transportation Council for transportation development credits
Resolution No. 21-24 would authorize the City Manager to sign the FY 2021 agreement with the Regional Transportation Council awarding the City transportation development credits.
-
Interlocal agreement with NCTCOG for Traffic Incident Management Program
Resolution No. 21-25 would authorize the City Manager to sign an interlocal agreement with the North Central Texas Council of Governments to participate in the Traffic Incident Management Program, which helps coordinate responses to crashes and other roadway incidents.
-
Award asphalt overlay contract to Peachtree Construction for $260,702.72
Staff recommends awarding Bid #52-21 to Peachtree Construction in the amount of $260,702.72 for the FY 2021 asphalt overlay program, which resurfaces city streets.
-
Agreement with TxDOT for Greenville Ave. multimodal improvements funding
Resolution No. 21-17 would approve an Advance Funding Agreement with the Texas Department of Transportation under the Transportation Alternatives Set-Aside (TASA) Program for multimodal improvements along Greenville Avenue, and authorize the City Manager to sign it.
-
Interlocal agreement with Dallas County for road repairs and improvements
The council would approve Resolution No. 21-14, authorizing a project-specific agreement with Dallas County for repair, maintenance, and improvements on a qualifying public roadway within Richardson.
-
Discussion of FY 2021-2022 streets and alleys maintenance plans
Council will review and discuss the city's planned maintenance strategies for streets and alleys in the upcoming fiscal year.
-
Award $668,074 contract for alley and utility reconstruction on Fontana Ave. and West Shore Dr.
The city recommends awarding a contract to KIK Underground for $668,074 to reconstruct the north alleys and utilities in the 800 block of Fontana Avenue and to reconstruct the north alley in the 500 block of West Shore Drive.
-
Purchase $174,930 in school flasher upgrades through BuyBoard cooperative
The city would issue a purchase order to Paradigm Traffic Systems, Inc. for $174,930 to upgrade school zone flashing lights, purchased through the Local Government Purchasing Cooperative (BuyBoard) Contract #603-20.
-
Annual contract for traffic control and signal preemption equipment via HGAC cooperative
The city would issue an annual requirements contract to Consolidated Traffic Controls for traffic control, enforcement, and signal preemption equipment at unit prices specified in Houston-Galveston Area Council of Governments (HGAC) Contract #PE05-21.
-
Reduce purchase order to Reynolds Asphalt for 2020 residential overlay program by $53,663.41
The council is asked to authorize the City Manager to decrease Purchase Order #201288 to Reynolds Asphalt & Construction Co. for the 2020 Residential Asphalt Overlay Program by $53,663.41, reflecting the final cost of completed work.
-
Main Street infrastructure project briefing
The council will review and discuss the Main Street infrastructure project.
-
Purchase electronic traffic signal cabinet locks for $107,972
Staff requests authorization to issue a purchase order to Consolidated Traffic Controls for electronic traffic signal cabinet locks through HGAC cooperative contract #PE-05-19 in the amount of $107,972.
-
Award contract for bridge rail improvements on N. Plano Road at Duck Creek
Staff recommends awarding Bid #25-21 to MHB Construction in the amount of $105,398 for northbound (east) bridge rail improvements on N. Plano Road at Duck Creek.
-
Award contract for 2021 screening wall repair and reconstruction
Staff recommends awarding Bid #29-21 to Ratliff Hardscape in the amount of $851,676.70, including Bid Alternates No. 1 and 2, for the 2021 Screening Wall Repair/Reconstruction Project.
-
Purchase of central traffic system software for $425,580.85 over five years
The city recommends buying and installing central system software for the Transportation & Mobility department from Texas Highway Products at a total cost of $425,580.85 over five years. The purchase would be made through the BuyBoard cooperative purchasing contract #608-20, which allows the city to skip a separate bidding process.
-
Approve $64,973.70 decrease to alley reconstruction contract with KIK Underground
The city manager would be authorized to execute a change order reducing Purchase Order #190874 to KIK Underground, LLC for the Alley Reconstruction & Utility Rehabilitation Project in the Fairview/Pacific/Ocean area by $64,973.70.
-
Discussion of transportation and mobility needs for a future bond program
The council will review and discuss transportation and mobility needs being considered for inclusion in a future bond program.
-
Contract for street joint and crack sealing services — Curtco, Inc. (Bid #19-21)
Staff requests approval of a cooperative annual requirements contract with Curtco, Inc. for joint and crack sealing services on city streets, using unit prices from City of Grand Prairie Contract #6533.
-
Contract award to Cam-Crete Contracting for alley repairs in Region A
The city seeks approval of an annual requirements contract with Cam-Crete Contracting, Inc. to repair alleys in Region A at an estimated cost of $1,210,730, based on unit prices.
-
Contract award to Cam-Crete Contracting for alley repairs in Region B
The city seeks approval of an annual requirements contract with Cam-Crete Contracting, Inc. to repair alleys in Region B at an estimated cost of $1,279,180, based on unit prices.
-
Update on 2015 Bond Program streets projects
The council will receive and discuss a status update on street projects funded by the Streets Proposition of the 2015 Bond Program.
-
Purchase one pothole patcher truck for the streets division
The city requests authorization to purchase one Freightliner conventional cab/chassis equipped with an HD Industries TCM 425-80 pothole patcher for the Streets division from Freightliner of Austin through TIPS Contract #200206 for $167,261.
-
Award alley reconstruction contract for Canyon Creek (Alleys A–E)
The city recommends awarding a contract to Advance Contracting Group to reconstruct five alleys in the Canyon Creek neighborhood, including two bid alternates. The total contract amount is $1,095,920.45.
-
Award $251,192 contract to Reynolds Asphalt for Park Vista Road paving improvements — Bid #90-20
Reynolds Asphalt & Construction Company would receive a purchase order for $251,192 to make paving improvements on Park Vista Road, using unit prices from City of Grand Prairie Bid #16112.
-
Award contract for South Dorothy Drive paving and water main improvements
The council is asked to award Bid #65-20 to Quality Excavation in the amount of $461,227 for paving and water main improvements on South Dorothy Drive.
-
Award contract for Old Campbell Road street reconstruction
The council is asked to award Bid #70-20 to Reliable Paving Inc. in the amount of $723,000.55, including Bid Alternate A, for street reconstruction on Old Campbell Road.
-
Increase contract with Environmental Design, Inc. by $112,000 for Main Street tree grow-in work
The city is asked to approve a change order increasing Purchase Order #191655 to Environmental Design, Inc. by $112,000, bringing the total contract value to $630,093 for tree maintenance and grow-in work along Main Street.
-
Council reviews and discusses the Main Street infrastructure project
Council will review and discuss the Main Street Infrastructure Project.
-
Award contract for Yale Boulevard bridge rail rehabilitation at Duck Creek
The council is asked to award a contract to McMahon Contracting LP to rehabilitate the northeast wingwall of the bridge rail on Yale Boulevard at Duck Creek for $144,684.17.
-
Award contract for 2020 asphalt overlay program
The council is asked to award a contract to Reynolds Asphalt & Construction Company to perform the city's 2020 asphalt overlay program — resurfacing city streets — for $294,421.80.
-
Authorize purchase of traffic detection equipment via cooperative contract for $1,012,980
The council is asked to authorize a purchase order to AM Signal, Inc. for traffic detection equipment bought through the BuyBoard cooperative purchasing contract #608-20 at a cost of $1,012,980.
-
Discussion: FY 2020-2021 street and alley maintenance strategies
Council will review and discuss the city's planned approach to maintaining streets and alleys during the upcoming fiscal year.
-
Award cooperative contract for hot and cold mix asphalt under Bid #61-20
Staff recommends an annual cooperative requirements contract with Texas Materials Group to supply hot and cold mix asphalt at unit prices established under City of Garland Bid #0204-18.
-
Interlocal agreement with NCTCOG for minor intersection traffic improvements
Resolution No. 20-07 approves an interlocal cooperation agreement between Richardson and the North Central Texas Council of Governments for a Minor Intersection Improvement Program covering traffic equipment.
-
Award $1,874,207.75 contract for Campbell Road improvements from Collins to US 75
Staff recommends awarding Bid #32-20 to Quality Excavation for Campbell Road improvements from Collins to US 75 for $1,874,207.75 including bid alternates, plus authorization for an owner's contingency of $80,000.
-
Purchase $133,356 in cellular modems and antennas for Transportation & Mobility
Staff requests authorization to issue a purchase order to GTS Technology Solutions, Inc. for $133,356 for Cradlepoint cellular modems and antennas for the Transportation & Mobility department, purchased through State of Texas DIR contracts #DIR-TSO-3652 and #DIR-TSO-4174.
-
Correct clerical errors in street-improvement phasing ordinance — Ordinance No. 4335
Ordinance No. 4335 would fix scrivener's (clerical) errors in Ordinance No. 4307 that relate to the phasing of street improvements.
-
Annual contract for traffic signs and materials — Osburn Associates
Staff requests authorization to issue an annual requirements contract to Osburn Associates, Inc. to supply traffic signs and related materials at pre-set unit prices under Bid #19-20.